Turkestan International Airport (Turkestan-Kazakhstan)

The construction of the airport was completed in a record 11 months. It is the first airport in Kazakhstan and the region to be built from scratch after the Soviet period, making it a Greenfield airport. 

Turkestan International Airport covers an area of 905 hectares and includes a 3,300 m runway, 2 taxiways, 1 service area, an apron large enough to accommodate 7 wide-body aircraft in the parking area, a 10,500 m2 airport terminal and 12,800 m2 of additional buildings. Turkestan International Airport can handle an annual passenger flow of 3 million people.
As Beacontact, we commissioned all the electronic construction technologies within a short period of 6 months and handed them over fully ready for the opening of the airport.

"By equipping Turkestan International Airport with state-of-the-art technology, Beacontact has transformed the region into a world-class air transport hub."

Extra-low voltage (ELV) systems
  • Fire Detection and Alarm System
  • Public Address and Voice Evacuation System
  • Access Control System
  • CCTV System
  • Software Integration of Low-voltage (ELV) Systems
Special Systems
  • Fiber Fence/Border Intrusion Detection System
  • Master Clock System
  • Video Wall and Control System
Airport Systems
  • Passport Reading System
  • Counterfeit Document Control System
  • Radio Active Cargo Detection System
Network
  • Industrial Switch Infrastructure at the Border Line / Fence
Automation
  • Mechanical Air Conditioning Automation System

Contact

Let's Create Solutions Together

We are here to discuss your questions, feedback and projects. Our experienced team is here to help you find solutions to meet your needs.

Feel free to reach out to us by completing the form or using the contact details provided.

Contact Us